Preparation

First thing I had to construct was a table to lay out the fuselage on. I made it up using two 2.400m x 0.900m pieces of flooring particle board mounted on 75mm x 35mm timber legs and braces

IMG_0100_JPGGeneral view of the workshop, Two Corvair engines in front

IMG_0101_JPGThe fuselage table

IMG_0102_JPGFuselage table. The drawing is a full size drawing of the fuselage dimensions

IMG_0187_JPGThis is what the spruce looked like after it was delivered